DC Water-Poplar Point Pumping Station

The PP-PS will handle sewage flows from much of southeast DC. Sewage will flow by gravity to the PP-PS through the existing Anacostia Main Interceptor, where it will be “lifted” and discharged into the major sewers that deliver flow to Blue Plains Advanced Wastewater Treatment Plant. At that point, sewage collected from this area of the District will be treated and discharged to the Potomac River. 

Aver has performed Dynamic Load testing ,Static Load Test (Lateral and Axial) for this project.

Project Gallery