• Inter County Connector – Contract A, Rockville, VA – 4 year project – (H-Piles) – ONGOING. (Estimation of pile lengths and capacities, dynamic load testing, pile integrity testing).
  • Inter County Connector – Contract C, Rockville, VA – 4 year project – (H-Piles) – ONGOING. (Estimation of pile lengths and capacities, dynamic load testing, pile integrity testing).
  • MD30 Relocated (Hampstead Bypass), MD – 2007
  • Woodrow Wilson Bridge, Piers V3 through V7, Inner loop, (24 inch Square, PSC piles). – 2002-2005
  • MD210, MB-3 Project, Prince George’s County, MD.-2006-2007
  • Heron Harbor Condominium, Harve De Grace, MD – 2006
  • Woodrow Wilson Bridge Replacement, Prince Georges County, 17 piers (inner and outer loops)  – pipe piles ranging from 48” to 72 inch diameter and 150 to 220 feet in length, 24” PSC piles on land – July 2001 – July 2002.
  • Woodrow Wilson Bridge, VA Approaches, (18 and 24 inch Square, PSC piles and 30 inch open end pipe piles). Cross-hole Sonic Logging (CSL) and Pile Integrity (PIT) tests on drilled piers. – 2004-2006
  • MD40, Baltimore, MD – 2004
  • Plant additions at FMC plant, Baltimore, Maryland. June 1998